Studies and Plans
Note: All of the following files are in PDF format.
- 1996 Engineering Study of Natural Gas Distribution System Improvements
- 1998 Cumberland Valley Trail Master Plan
- 2001 Athletic Field Study
- 2001 Heiges Field House Addition Study
- 2001 Heiges Field House Addition Study Drawings
- 2002 Campus Boundary Survey
- 2002 Food Services Master Plan
- 2002 Parking Evaluation and Development Study
- 2002 Master Plan for Site Lighting
- 2004 Lehman Addition Feasibility Study
- 2004 Electrical Infrastructure Study
- 2004 Electrical Infrastructure Study Supplement 1: Electrical Coordination Study
- 2004 Student Recreation Center Feasibility Study
- 2005 Shippensburg Borough Comprehensive Plan
- 2005 Telecommunications Infrastructure Study
- 2005 Central Steam Plant Study
- 2005 CUB Expansion Feasibility Study
- 2005 Regional Transportation Study
- 2005 Residential Facility Condition Assessment
- 2005 Resident Hall Air Conditioning Study
- 2005 Dauphin Humanities Center Feasibility Study
- 2006 Classroom and Laboratory Utilization Analyses
- 2006 Reisner Feasibility Study
- 2006 Huber Arts Center Facility Study
- 2007 Student Housing Market Study
- 2007 CUB Expansion Revised Feasibility Study
- 2008 Seth Grove Stadium and Field House Feasibility Study
- 2008 CUB-Library Integration Study
- 2009 Loop Road Feasibility Study
- 2010 Central Chilled Water System Feasibility Study
- 2010 Ground Source Heat Pump Feasibility Study
- 2010 Shippensburg Downtown Plan
- 2011 Capital Telecoms Renovation Feasibility Study
- 2011 Renovation of Electrical Distribution System Feasibility Study
- 2011 Campus Electrical Plan for Housing and Central Utility Plan Study
- 2011 Campus Heating System Feasibility Study
- 2011 Martin House Feasibility Study
- 2011 Old Main HVAC System Feasibility Study
- 2012 Lehman Library Action Plan
- 2013 Fogelsonger Storage Area Wetland Identification and Delineation
- 2014 Ezra Lehman Library Study
- 2014 Site Telecommunications System Upgrade Feasibility Study
- 2014 Stewart Hall Feasibility Study
- 2014 Franklin Science Center Feasibility Study
- 2016 Classroom and Laboratory Utilization Analyses
- 2017 Ezra Lehman Library Archives & Special Collections Feasibility Study
- 2017 Franklin Science Center Feasibility Study Addendum
- 2017 Horton Hall HVAC Feasibility Study
- 2017 Gilbert Hall HVAC Feasibility Study
- 2017 Heiges Field House Cooling Feasibility Study
- 2019 Athletic Locker Room Study